Incorporation of a new substation for Electra de Santa Comba

Integration of a new substation for Electra de Santa Comba with Sismored 4.0. This allows the client to monitor its status and measurements, as well as being able to perform remote control actions as well. Likewise, the effective integration of the substation into Spain's Power Network (REE) monitoring system has also been successfully carried out.

In this way, the number of remote-control centres using Sismored has increased, amounting to 11 TCs (transformation Centers).